At the end of 2016, Intermolde concluded the expansion works of the Neck Rings factory.
They were only about 300m2 additional, but fundamental to welcome the plating area with 3 PLASMA equipment exclusively dedicated to Neck Rings and Guide Rings.
This specialization measure will be very important for productivity and quality.
The Neck Rings factory, as necessary, will use the installed capacity of 4 other PLASMA equipment in the main plant which is at a distance of approximately 100m.
The quality control has been modernized, with a Renishaw 3D measuring machine with digital camera and touch probe.